Construction updates

September 2009
The project to expand the library and add the environmental center and amphitheater is nearing completion. The finishes have been installed, as well as the ceramic tile in all of the bathrooms and the foyer of the community meeting room area. Carpet installation has been completed. Workers are nearing completion of the linoleum installation in the auditorium and the Lyonia Environmental Center. The cabinetry has been installed, as well as the new service desks. Interior painting has been completed.

The amphitheater is complete with the installation of the bollard lighting and the stainless steel cable rail system and handrails. The landscaping has been installed throughout the property.

The new furniture is beginning to arrive and installed in the building. The furniture and collections are arriving on site and the move-in process is beginning.

April 2009


April 2009 aerial photo 1


April 2009 aerial photo 2

December
The month of November involved quite a bit of work at the amphitheater/balcony location. Two very large (36-inches in diameter) columns and a 24-inch column were poured to just below the balcony beam height. The amphitheater balcony was poured November 25. This will allow workers to complete the final wall of the new addition. On the east side of the building, the walls are completely topped out and the east slab was poured November 21. The west side of the building has 95 percent of the walls topped out. The remaining area is being used for access into the building pad. In a few weeks this area will be closed off and the remaining wall area will be topped out as well.

The concession building was laid out and the plumbing rough-in was completed November 26.

The interior of the existing building is coming along as well. The door frames are being set in the new walls. In the coming weeks, workers will begin to hang drywall. The exterior demolition is almost complete.

Site work continues each day. The two new parking lots have been brought up to the limerock level, and the underground utility work is being completed in all locations.

December update photos

November
The project is 20 percent complete. Approximately 99 percent of the perimeter foundations and the walls have started to go up. Workers have poured concrete where the large footings for the shade columns at the balcony over the amphitheater will be located. The exterior demolition work is approximately 90 percent complete and 100 percent complete with the interior. Workers have started to build the new walls in the existing portion of the building. Work also has been started on the mechanical, electrical, plumbing and fire protection rough-in work in the existing building.

The site work is continuing. The two new parking areas are being brought up to grade level and the underground utility work is being completed in all locations.

 